TRADE SPECIFIC INFRASTRUCTURE BUILDING AND WORKSHOP HISTORY

Trade

Unit

Classroom area per unit (square meter)

Total classroom area (square meter)

Workshop area per unit (square meter)

Total workshop area (square meter)

Remark/Photograph

Draughtsman Civil

1

30.00

30.00

81.71

81.71

 

Draughtsman Mechanical

1

-

-

-

-

 

Electrician

1

30.44

30.44

264.00

264.00

 

Fitter

1

25.65

25.65

175.30

175.30

 

Mechanic Motor Vehicle

1

41.67

41.67

214.80

214.80

 

Wireman

1

41.67

41.67

190.00

190.00

 

Baker & Confectioner

2

30.24

30.24

83.20

83.20

 

Carpenter

1

41.67

41.67

264.90

264.90

 

Food Beverage

2

30.24

30.24

83.20

83.20

 

Fruit & Veg. Processor

2

30.24

30.24

101.33

101.33

 

Sewing Tech.

1

41.27

41.27

79.70

79.70

 

Surveyor

1

41.27

41.27

81.32

81.32

 

Welder

1

41.67

41.67

200.00

200.00

 

Engg. Drg.

1

81.32

81.32

-

-

 

W. Cal. & Sc.

1

81.71

81.71

-

-

 

IT Lab

1

81.33

81.33

-

-

 

Copyright © 2018 Raiganj Govt ITI Designed & Hosted by Technogleam